Forecasting receiving water response to alternative control levels for combined sewer overflows discharging to Toronto’s Inner Harbour

Authors

  • William J. Snodgrass Toronto Water, City of Toronto, 18th Floor Metro Hall, 55 John Street, Toronto, Ontario M5V 3C6, Canada
  • Ray Dewey Toronto Water, City of Toronto, 18th Floor Metro Hall, 55 John Street, Toronto, Ontario M5V 3C6, Canada
  • Michael D’Andrea Toronto Water, City of Toronto, 18th Floor Metro Hall, 55 John Street, Toronto, Ontario M5V 3C6, Canada
  • Rob Bishop Toronto Water, City of Toronto, 18th Floor Metro Hall, 55 John Street, Toronto, Ontario M5V 3C6, Canada
  • Jian Lei Toronto Water, City of Toronto, 18th Floor Metro Hall, 55 John Street, Toronto, Ontario M5V 3C6, Canada

Keywords:

models, water quality, E. coli, multiple benefits

Abstract

This article evaluates the role that different levels of control for combined sewer overflows have in addressing the recreational water quality objectives of the Toronto Inner Harbour of the Toronto and Region Remedial Action Plan. Three models are used to establish the predictive methodology: the Infoworks model for the combined sewer service area, the Hydrologic Simulation-F model for the remainder of the watershed, and the MIKE 3 computer code to evaluate Lake Ontario response to control. Each model was calibrated with E. coli densities observed respectively in sewer discharges, instream, and in the Inner Harbour. Two indices are used to evaluate the response of water quality in the Inner Harbour – fraction of the surface area achieving Blue Flag status, and portion of the swimming season (June to August) above recreation objectives. Analyses of control options led to the recommendation that virtual elimination of combined sewer overflows (one overflow per season control strategy) should be pursued, rather than the lower level of control of 90% volumetric control, which is the minimum provincial environmental requirement. Implementation of priority projects for improving water quality along the Toronto waterfront, including the Don River and Central Waterfront project, are integral to delisting Toronto as a Great Lakes Area of Concern.

References

Beletsky, D., Schwab, D., McCormick, M., 2006. Modeling the 1998–2003 summer circulation and thermal structure in Lake Michigan, J. Geophys. Res. 111, C10010, doi:10.1029/2005JC003222.

Bicknell, BR., Imhoff, JC, Kittle, J.L. Jr., Jobes, T.H., Donigian, A.S. Jr., 2001. Hydrological Simulation Program – Fortran (HSP-F) Version 12 USER’S Manual. In co-operation with Hydrological Analysis Software Division. Office of Information USGS and National Exposure Risk Assessment Laboratory, US EPA, March 2001.

CIty of Toronto, 2017. 2017 Wet Weather Flow Master Plan Implementation Status Update. https://www.toronto.ca/legdocs/mmis/2017/pw/bgrd/backgroundfile-103216.pdf.

D’Andrea M., Snodgrass, W.J., Chessie, P.D., 2004. Receiving Water Response to a Master Plan for Wet Weather Flow Management Developed in the City of Toronto. Wat Qual. Res. J. Can. 39, 319–378.

DHI (Danish Hydraulic Institute), 2002. MIKE3 - A 3D Modelling System for Rivers, Lakes, Estuaries, Coasts and Oceans.

Hlevca, B., Wells, M.G., Cruz Font, L., Doka, S.E., Portiss, R., St. John, M., Cooke, S.J., 2018. Water circulation in Toronto Harbour. Aquat. Ecosys. Health Mngmt. 21(3), 234–344.

Howell, E.T., Dahmer, S.C., Chomicki, K.M., Benoit, N., Boyd, D., Brown, G.S. 2018. Monitoring water quality on the central Toronto waterfront: Perspectives on addressing spatiotemporal variability. Aquat. Ecosys. Health Mngmt. 21(3), 255–267.

MMM (Marshall Macklin Monaghan Limited), 2003. Don River watershed, Study Area 4 of City of Toronto, Wet weather flow management master plan. Available from City of Toronto Urban Affairs Library, Toronto, ON.

MMM Group Ltd., 2012. Don River and Central Waterfront Project – Municipal Class EA Environmental Study Report. Report available through City of Toronto Reference Library, Toronto, ON.

MECP (Ministry of the Environment and Climate Change), 1994. Water Management policies, guidelines, provincial water quality objectives. https://www.ontario.ca/…/water-management-policies-guidelines-provincial-water-quality-objectives/.

MECP, (2016 update) Procedure F5-5. Determination of treatment requirements for municipal and private combined and partially separated Sewage systems. https://www.ontario.ca/…/f-5-5-determination-treatment-requirements-municipal-and- private-combined-and- partially-separated-sewage-systems/.

Schwab, D. J., 1983. Numerical simulation of low-frequency current fluctuations in Lake Michigan, J. Phys. Oceanogr. 13, 2213–2224.

Toronto and Region Remedial Action Plan (RAP), 1989a. Metro Toronto and Region Remedial Action Plan. Stage I Environmental conditions and problem definition. ISBN: 0-7778-1656-3.

Toronto and Region Remedial Action Plan (RAP). 1989b. Metro Toronto and Region Remedial Action Plan. Stage II Clear Waters, Clean Choices Recommendations for Action. ISBN: 0-7778-2807-7.

Wallingford Software, 2006. Infoworks CS modelling platform. Available through Innovyze, (www.innovyze.com) Monrovia, CA, USA.

Published

2018-07-03